HUEN
Book an appointment

Air conditioner installation
at a price you know in advance

We tell you what it costs, and we tell you what could come on top of it. The final figure does not appear at the end of the job.

How it works

  1. Agreeing the layoutWe agree where the indoor and the outdoor unit go, and which way the pipework runs.
  2. Brackets and wall openingWe fit the brackets, drill through the wall, and pull the pipes and the cable through.
  3. Connection and vacuumingWe connect the copper pipes and evacuate the system with a vacuum pump. This step is essential for the life of the unit, and it is the one most often skipped.
  4. Condensate drainBy gravity, or with a pump if the layout needs one.
  5. Commissioning and handoverWe set it up, test it in both cooling and heating mode, and show you how to use it.

Prices

Standard installation

100 000 HUF
one indoor unit, mounting material included

Mounting material

included
base package, up to 3 metres of pipe

The unit itself

depends on the model
prices are listed on our Hungarian catalogue page

If it turns out on site that more material or harder work is needed, we tell you first and you decide. Nothing arrives as a surprise afterwards.

Our device catalogue is currently available in Hungarian only. If you tell us the size of the room, we will recommend a unit in English and send you the price in writing.

Frequently asked questions

How much does installation cost?Standard installation is 100 000 HUF, and the mounting material is included: fitting the indoor and outdoor unit, drilling through the wall, vacuuming the system, commissioning, plus the insulated copper pipe, the cable, the trunking, the bracket and the condensate drain.
What does standard installation mean?Up to 3 running metres of insulated copper pipe, the supply and interconnecting cable, the condensate drain, the wall bracket, the anti-vibration pads and the trunking. Anything above that we charge per metre.
What costs extra?Pipe runs longer than 3 metres, work from scaffolding or a cherry picker, a pumped condensate drain, drilling through concrete, and a separate support structure for the outdoor unit if one is needed.
How long does it take?Installing one indoor unit typically takes half a day. With several units, or where the installation is difficult, a full day.
What do I need to prepare?Nothing. We agree where the unit goes, and we bring the tools and the material. It helps if the place for the indoor unit is clear and accessible.

Book an appointment in a few clicks

Pick a free slot in our calendar. If you would rather talk to someone, just call us. We speak English.

Book an appointment +36 20 418 9041